EIEIOTECHNOVATION
← Training programmes

EIEIO / CLOUD & VIRTUALISATION

VMware vRealize Suite Lifecycle Manager- Install, Configure, Manage [V8.0]

Course outline

2 days

Duration

2 days

Overview

This two-day course features hands-on training that focuses on installing, configuring, and managing VMware vRealize® Suite Lifecycle Manager™, which includes products such as VMware vRealize® Operations™, VMware vRealize® Log Insight™, and VMware vRealize® Automation™. This course prepares you to administer a vRealize infrastructure for an organization.

Course Objectives

By the end of the course, you should be able to meet the following objectives:

  • List the use cases for vRealize Suite Lifecycle Manager
  • Describe the architecture of vRealize Suite Lifecycle Manager
  • Deploy and configure vRealize Suite Lifecycle Manager
  • Create, manage, and scale vRealize Suite Lifecycle Manager environments
  • Add VMware vRealize® Suite products to vRealize Suite Lifecycle Manager
  • Manage vRealize Suite products with vRealize Suite Lifecycle Manager
  • Use vRealize Suite Lifecycle Manager to perform content lifecycle management
  • Troubleshoot day-to-day operations of vRealize Suite Lifecycle Manager

Target Audience

  • System administrators
  • System engineers

Prerequisites

Basic understanding of vRealize Suite or products such as vRealize Operations, vRealize Automation, or vRealize Log Insight.

Product Alignment

  • vRealize Suite Lifecycle Manager 8.0
  • VMware vCenter Server® 6.7
  • vRealize Automation 7.6
  • vRealize Operations 8.0
  • vRealize Log Insight 8.0

Outline

  • Course Introduction
  • Introductions and course logistics

Course objectives

  • Introduction to vRealize Suite Lifecycle Manager
  • Describe the use cases for vRealize Suite Lifecycle Manager
  • List the features of vRealize Suite Lifecycle Manager
  • List system requirements for vRealize Suite Lifecycle Manager
  • Use vRealize Easy Installer to deploy vRealize Suite Lifecycle Manager
  • Verify that a vRealize Suite Lifecycle Manager deployment is successful
  • vRealize Suite Lifecycle Manager Configuration
  • Create SSL certificates for vRealize Suite product instances
  • Add certificates to vRealize Suite Lifecycle Manager
  • Import custom SSL certificates
  • Add vRealize Suite Lifecycle Manager infrastructure elements
  • Add vRealize Suite product Installation media
  • Adding vRealize Suite Products
  • Deploy a new vRealize Suite product
  • Manage a vRealize Suite product using vRealize Suite Lifecycle Manager
  • Add an existing vRealize Suite product to an environment
  • vRealize Suite Lifecycle Manager Day 2 Operations
  • Perform On-going Management Tasks
  • Monitor environment health
  • Ensure product configuration compliance
  • Use content from Marketplace
  • Scale-out VMware Identity Manager™
  • Replace an existing certificate
  • Manage SDDC content
  • Perform source control
  • Describe content pipelines
  • vRealize Suite Lifecycle Manager Migration
  • Prepare a legacy vRealize Suite Lifecyle Manager instance for migration
  • Migrate a legacy vRealize Suite Lifecycle Manager to vRealize Suite Lifecycle Manager 8.0
  • Troubleshooting vRealize Suite Lifecycle Manager
  • Identity the vRealize Suite Lifecycle Manager component settings
  • Describe the procedure to generate and download the support bundles.
  • Identity the tools available for troubleshooting a vRealize Suite Lifecycle Manager environment
  • Recognize entries in commonly accessed vRealize Suite Lifecycle Manager log files

Programme scope, delivery arrangements and suitability are confirmed during enquiry.