Duration
3 days
Overview
- This is a 3-day instructor-led classroom training that provides you with hands-on experience to creating complex reports. You will also get a comprehensive overview of the functionality of Crystal Reports for Enterprise.
Audience
- Business Analyst
- Developer
- System Administrator
Prerequisites
Essential
- BOCE10
Recommended
- Basic knowledge of database concepts
- Basic programming knowledge"
Course based on software release
- SAP Crystal Reports for Enterprise
- SAP BusinessObjects BI platform 4.1
Content
- Running Totals
- Creating a Report with Running Totals
- Formulas and Functions
- Using String Functions and Operators
- Using Date and Time Functions
- Control Structures
- Creating Control Structures
- Variables
- Creating Variables
- Arrays and User Functions
- Creating Arrays
- Creating User Functions
- Loops
- Describing Loops in Reports
- Parameters, Filters, and Prompt Panels
- Examining Standard Parameters
- Using Interactive Filters
- Using Prompt Panels and Responding to Parameters
- Additional Parameter Types
- Using Different Types of Parameters
- Creating Date Range Parameters
- Using Edit Mask and Description Fields
- Cascading Prompts and Multiple Parameters
- Using a Cascading Prompt
- Building a Report with Multiple Parameters
- Crosstabs
- Defining Crosstabs
- Formatting a Crosstab
- Formatting Crosstabs Conditionally
- Crosstab Formulas and Calculated Members
- Using Calculated Members
- Adding Formulas to Calculated Members
- Displaying Hierarchies in Crosstabs
- Multi-Pass Reporting
- Using the Report Processing Model
- Subreports
- Defining Subreports
- Creating Subreports
- Subreports Usage
- Using Subreports
- Linked and On-Demand Subreports
- Linking a Subreport to the Main Report
- Creating On-Demand Subreports
- Advanced Subreport Usage
- Passing Data Between Subreports and Main Reports
- Linking Unlinkable Data Using Subreports
- Report Hierarchical Data
- Grouping Hierarchical Data
- Report Form Letters, Hyperlinks, and Dynamic Graphics
- Building a Form Letter Report
- Building a Report with Hyperlinks
- Using Dynamic Graphic Locations
- Additional Specialized Reports
- Building a Report with Alerts
- Building Top N and Bottom N Reports
- Integrating Flash Objects
Programme scope, delivery arrangements and suitability are confirmed during enquiry.