Duration
5 days
Audience
This course is intended for:
- Network engineers
- Test engineers
- Network administrators
- Network managers
- Mid-level wireless support engineers
- Network designers
- Project managers
Prerequisites
The knowledge and skills you must have before attending this course are as follows:
- Interconnecting Cisco Networking Devices Part 1 (ICND1)
- Interconnecting Cisco Networking Devices Part 2 (ICND2)
- Implementing Cisco Unified Wireless Networking Essentials (IUWNE)
It is also recommended that you have a basic knowledge of the following:
- Cisco Lifecycle Services
- Wireless standards (IEEE)
- Wireless regulator environment (FCC, ETSI, and so on)
- Wireless certification organization (Wi-Fi Alliance)
Module 1 Collect Information for the Site Survey
- Identifying Customer Requirements
- Identifying Site Survey Requirements for Different Vertical Industries
- Designing coverage for specific applications and client devices
- Designing outdoor coverage
- Identifying Regulatory Issues
- Identifying Safety and Aesthetic Requirements
Module 2 Prepare and Plan for the Site Survey
- Conducting a kickoff meeting
- Conducting an Initial walkthrough
- Specifying the Tools Necessary to Complete a Site Survey
- Choosing the hardware for the deployment and the Site Survey
- Choosing the right antennas for the deployment and the Site Survey
- Finalizing Logistical Considerations
Module 3: Conduct the Site Survey
- Estimating the AP number and density using a planning tool
- Conducting a Layer 1 Site Survey
- Conducting a Layer 2 Site Survey for Data
- Conducting a Layer 2 Site Survey for Voice and Video Applications
- Conducting a Layer 2 Site Survey for Location
Module 4: Design the RF Network
- Determining the Infrastructure hardware Requirements for the WLAN
- Determining the effect of WLAN on the infrastructure
- Determining the WLAN Equipment and Licenses
- Designing the outdoor mesh network
Module 5: Assess the Deployment
- Verifying WLAN Readiness
- Verifying the RF Coverage onsite.
- Verifying the RF Performance.
- Verifying mesh Performance.
- Presenting an Installation Report
Programme scope, delivery arrangements and suitability are confirmed during enquiry.