Duration
1 day
Overview
After the establishment of FMEA and APQP, it is necessary to put relevant and critical actions into the Control Plan. The Control Plan will serve as a guide to process control where we can carry out check and balance activities by doing audit with reference to the Control Plan.
In this workshop, we will guide the participants to prepare a proper Control Plan based on Automotive Industry Requirements in a step by step approach.
Workshop Objectives
- Understand the Control Plan process
- Correlate the Control Plan process with the APQP cycle
- Identify how Control Plans benefit your organization
- Learn to construct a Control Plan
Who Should Attend?
Quality assurance, engineering, and other process personnel responsible for preparing control plans.
Course Contents
- Introduction to Control Plans
- Types of Control Plan for various processes, such as Machine Dominant, Operator Dominant, Maintenance Dominant etc.
- 5W1H of Control plans.
- Application and benefit of control plans.
- Details of control plan and construction.
- PROTOTYPE, PRE-LAUNCH, PRODUCTION.
- DOCUMENT NO. / REV LEVEL
- PART NUMBER/ PART NAME / DESCRIPTION
- SUPPLIER / PLANT/ SUPPLIER CODE
- KEY CONTACT / PHONE
- CORE TEAM
- SUPPLIER / PLANT / APPROVAL / DATE
- DATE (ORIG.)/ DATE (REV.)
- CUSTOMER ENGINEERING APPROVAL / DATE
- CUSTOMER QUALITY APPROVAL / DATE
- OTHER APPROVAL / DATE
- PART / PROCESS NUMBER
- PROCESS NAME / OPERATION DESCRIPTION
- MACHINE, DEVICE, JIG, TOOLS FOR MANUFACTURING
- Develop Characteristics of process output based on the followings:
- NUMBER
- PRODUCT / PROCESS
- Establish Methods or procedures or tools to control process
- PRODUCT / PROCESS SPECIFICATION / TOLERANCE
- EVALUATION / MEASUREMENT TECHNIQUE
- SAMPLE SIZE FREQUENCY
- CONTROL METHOD
- REACTION PLAN
- Control Plan Construction by team based on a selected product of your company.
- Presentation and comment of Control Plans established by the teams.
Course Methodology
This session will be conducted in the form of lecture about 40% with the rest of 60% in real life exercises and workshops to draft out the control plan of the participants working examples
Programme scope, delivery arrangements and suitability are confirmed during enquiry.